Engineering center
GOChS «BASIS»

Completed projects

Boiler room in Vladivostok
23.12.2019 |

Boiler room in Vladivostok

IC GOChS "BAZIS" for the Boiler room facility in Vladivostok performed A full range of works, including design, construction and installation, start-up and commissioning and commissioning of the SMIS, SMIK system at the facility "Complex development of the territory in the area of 100 Russkaya St. in Vladivostok, 1st stage...
Multifunctional complex "Mosfilmovskaya" with underground parking
15.07.2019 |

Multifunctional complex "Mosfilmovskaya" with underground parking

IC GOChS "BAZIS" performed the following works for the object "Multifunctional complex with underground parking": • adjustment of the Working Documentation for SMIS and SMIK; • complete delivery of products and materials to the Facility with loading and unloading operations and to the place of Work; • general construction and...
Vysotsk port
29.01.2019 |

Vysotsk port

ITC GOChS "BAZIS" for the object Port of Vysotsk, power unit No. 1 completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS, SMIK, SUKS systems at the facility "Terminal for the production and transshipment of liquefied natural gas in the port of...
Catalyst production with a capacity of 3000 tons per year
06.12.2018 |

Catalyst production with a capacity of 3000 tons per year

IC GOChS "BAZIS" for the object. A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS system at the "Structured system for monitoring and control of engineering systems of buildings and structures SMIS of oligomers and glycols" PJSC "Nizhnekamskneftekhim". SMIS production of KDI-M catalyst...
Nizhnekamsk CHP
23.11.2018 |

Nizhnekamsk CHP

IC GOChS "BAZIS" for the facility Nizhnekamsk CHP completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS system at the facility "Construction of a pipeline of initial (river) water No. 1, 2 of Nizhnekamsk CHPP". Customer: JSC "TGK-16" - "Nizhnekamsk CHPP-1" Nizhnekamsk...
Nizhnekamskneftekhim Isoprene Monomer Plant
23.11.2018 |

Nizhnekamskneftekhim Isoprene Monomer Plant

IC GOChS "BAZIS" for the Nizhnekamskneftekhim facility Isoprene-monomer plant completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS system at the facility "Technical re-equipment of isoprene production at the IM plant" Customer: PJSC "Nizhnekamskneftekhim" The main types of manufactured products: isoprene, methyl...
The first power unit of the Belarusian NPP
15.10.2018 |

The first power unit of the Belarusian NPP

IC GOChS "BAZIS" for the object of the Belarusian NPP, power unit No. 1 completed • supply of equipment and materials to the object Customer: Joint Stock Company "Atomstroyexport" (JSC ASE) The Belarusian NPP is the first nuclear power plant in Belarus, of the AES-2006 type. It is located at...
Diaghilevskaya CHPP
20.09.2018 |

Diaghilevskaya CHPP

IC GOChS "BAZIS" for the facility Diaghilevskaya CHPP completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS, SMIK, SUKS systems at the facility "Expansion of the Diaghilevskaya CHPP. Construction of a 115 MW CCGT unit, including the existing part of the Diaghilevskaya...
Launch complex of SC "Angara" of the "Vostochny" cosmodrome
04.10.2017 |

Launch complex of SC "Angara" of the "Vostochny" cosmodrome

IC GOChS "BAZIS" for the "Angara" launch complex, site 1A of the "Vostochny" cosmodrome performed: - development of STU SMIS; - development of design documentation for SMIS. Customer: JSC "31 GPISS" The creation of the Angara CSC is a task of special state importance. The commissioning of this rocket complex...
Construction of a separate industrial production of methylchlorosilanes "KZSK-Silicon"
23.01.2017 |
No category

Construction of a separate industrial production of methylchlorosilanes "KZSK-Silicon"

Engineering Center GOChS "BASIS" performed the following works for the facility "Construction of a separate industrial production of methylchlorosilanes "KZSK-Silicon": - adjustment project dokumenattsii SMIS; - development of SMES working documents. Cu stomer: VPO "KNRTU" PI "Soyuzhimpromproekt" Located on the territory of JSC "Kazan plant of synthetic rubber" production of...